PT. SIAM-INDO GYPSUM INDUSTRY

Tips & Tricks

  US Indonesia    US English

Ceiling Installation

  1. If the length of the ceiling above 15 m, at each interval of 15 m is given expansion joint range of 10 mm so as not easy to crack.
  2. For rooms that will be installed ceiling and partitions, install ceiling first. However, if want more sound proof so attach partition first.
  3. For the system must have sufficient space to prevent cracks gypsum board.
  4. To check the ceiling is installed, place the gauge / leveling measuring length 2 m in places that have been determined, the distance between the ceiling surface with the gauge must be no more than 5 mm.

Tips & Tricks

Partition Instalation

Ceiling Installation



Home About Us Products System News Export Project Contact Us
Copyright © 2005 - 2006 Siam-Indo Gypsum Industry